Tashkent, Mukhtar Ashrafi str., 34. Landmark: Yashnabad power supply, Samarkand cafe.
Mo-Fr 9:00—18:00; Sa 9:00—16:00
Tashkent
✖
Is Columbus your city?
Yes
Choose another city
CATALOG
The cart is empty$00
The cart is empty
cart is empty
0CartEmpty$0
The cart is empty
cart is empty

Electricity meter 1-phase | TE71 MP-1-3 220V 10-60A | PLC modem

5.00
Share
Bestseller!

⚡ The TE71 MP-1-3 220 V, 10–60 A single-phase multifunction electricity meter is designed for accurate multi-tariff measurement of active and reactive energy in apartments, private houses and small commercial properties. Its removable PLC module transmits readings over existing power wiring to a compatible concentrator, while RS-485 and the optical port support configuration and local data reading.

Additional services:
Characteristics
Brand:
Tashelectroapparat
Phase:
1-phase
Supply:
Battery, 220V
Amperage:
60 A
Installation object:
Apartment, Cottage, A private house, The solar panel, Electric vehicle, Company
Connecting ASKUG:
Yes
Connecting ASKUE:
Yes
See all
Купите 50 шт. и получите в подарок:
при покупке от 50 шт и выше за раз.
SKU: 20009659
Warehouse 1 (Ashrafi-34):Left:40 pcs
Bought:2253 pcs
3score
?
The number of bonuses that you will receive when purchasing this product
$117.36/pcs.
$119.84/pcs.
- 2%
Saving  $2.48/pcs.
Amount:
pcs.
Total:
$117.36
$119.84
- 2%
Saving  $2.48
Payment methods:
Online payment:
Payme · Click · Rahmat
For businesses:
By invoice
Uzum Nasiya installments:
for 3-6-9-12 months

Availability and conditions are determined when placing an order in the Shopping Cart

Delivery and pickup

Calculating delivery dates…
Express delivery is at 2x-3x rate.
Notify me of a price reduction
Notify me of a price reduction
Ваша просьба принята!

Вы получите уведомление при снижении стоимости товара на указанные Вами контакты
Your E-mail
Your telephone number
- Fields must be filled in
Checking...
Order by phone:+998 71 200-18-00

Related files

  • user_interface_te71_uzbcyr.pdf 178.31 KBytes Истеъмолчи учун маълумот - TE71 1-фазали электр ҳисоблагичи
  • user_interface_te71_uzblat.pdf 131.10 KBytes Истеъмолчи учун маълумот - TE71 1-фазали электр ҳисоблагичи
  • TE71_manual_rus_v2021.1.pdf 1.19 MBytes Руководство по эксплуатации 1-фазного счётчика электроэнергии TE71
  • user_interface_te71_rus.pdf 140.70 KBytes Информация для потребителя по установке и эксплуатации 1-фазного счётчика электроэнергии TE71

Good to know

Articles and guides for this product

Description

TE71 MP-1-3 220 V, 10–60 A single-phase electricity meter with PLC module

⚡ The TE71 MP-1-3 is a multifunction electronic meter manufactured by ToshElectroApparat for active and reactive energy measurement in a single-phase two-wire network.

🔤 Model designation

  • M — multifunction version;
  • P — removable PLC communication module;
  • 1 — single-phase meter.

The letter P identifies a PLC module, not a GSM modem.

🔌 Electrical ratings

  • network — single-phase, two-wire;
  • rated voltage — 220/230 V;
  • current rating — 10(60) A;
  • maximum current — 60 A;
  • frequency — 50 Hz;
  • connection — direct;
  • starting current — 20 mA.

🎯 Accuracy

  • active energy — class 1.0;
  • reactive energy — class 2.0;
  • meter constant — 1000 imp/kWh.

🕒 Multi-tariff operation

The meter supports up to four tariffs, with schedules based on seasons, day types and time periods.

📡 PLC communication

PLC transmits meter readings through existing power wiring to a compatible data concentrator.

No SIM card is required inside the meter for PLC communication.

A compatible concentrator, server connection and AMR software are required for internet-based remote reading.

🔗 Communication interfaces

  • PLC over mains wiring;
  • RS-485 wired digital interface;
  • optical port for local reading and configuration;
  • GSM/GPRS only when a separate compatible module is installed.

💾 Memory and event records

The meter stores tariff registers, load profiles, daily and monthly values and event records in non-volatile memory.

🚨 Monitored events

  • meter-cover or terminal-cover opening;
  • power failure;
  • reverse energy flow;
  • phase and neutral current mismatch;
  • power-limit violation;
  • overvoltage or undervoltage;
  • external magnetic influence;
  • low internal-battery condition.

🔐 Load control

When the applicable relay is fitted and configured, the system can remotely disconnect or reconnect the load and enforce a power limit.

🌡️ Operating conditions

  • normal operating temperature — −25 to +55 °C;
  • limiting temperature range — −40 to +70 °C;
  • ingress protection — IP54.

📦 Package contents

  • TE71 MP-1-3 electricity meter;
  • removable PLC module;
  • terminal cover;
  • product passport;
  • operating manual;
  • warranty certificate;
  • Uzstandard certificate;
  • factory box.

✅ Key advantages

  • single-phase 220/230 V measurement;
  • direct connection up to 60 A;
  • removable PLC module;
  • active and reactive energy measurement;
  • up to four tariffs;
  • RS-485 and optical port;
  • load profile;
  • event logging;
  • AMR-system operation;
  • manufactured in Uzbekistan.

⚠️ Important: remote reading requires a compatible PLC concentrator and an operational AMR infrastructure in addition to the meter.

Features
Brand
Tashelectroapparat
Phase
1-phase
Supply
Battery, 220V
Amperage
60 A
Installation object
Apartment, Cottage, A private house, The solar panel, Electric vehicle, Company
Connecting ASKUG
Yes
Connecting ASKUE
Yes
Certificate (years):
10 - individual, 10 - legal entity
Number of tariffs
4
Direction of accounting
Active, Reactive
Accurasy (active) %
1
Accurasy (reactive) %
2
Sensitivity threshold m3/h
0.004
Rated frequency
50 Hz
Equipment
Product, Box, Passport, Certificate, Modem (built-in)
Quantity per box
20
Size (length-width-height)
209 × 130 × 73 mm
Package size (length-width-height)
235 × 135 × 85 mm
Weight (gross)
950 g
Color
Silver
Guarantee
36 mo.
Life time
30 years
Working temperature
-30 — 70 °C
Degree of protection (IP)
IP54 — dust-protected, protected against splashing water
Number of ports
4
Maximum cross-section of the connected wire (mm)
5
Grounding
Yes
Country
Uzbekistan
Condition
New
GOST
O`zDSt 8.079:2018,ГОСТ 31818.11, ГОСТ 31818.21 ГОСТ 31818.23
ISO
Ts18726720-003:2018
Have bought
2253
Reviews

Loading...
Особенности

Afzalliklar

Frequently bought together
Alternative products
We use cookies to make the site better for you.