HH
Husniddin Hafizov
(Переведено Google) Большое спасибо. (Оригинал) Ajoyib raxmat
Read review ↗
Cold Water Meter | Uzmeter Dn-20
Ultrasonic Gas meter | Sarf G4 Vertical | +Modem, SIM card, valve, certificate
Mechanical hot and cold water meter SWEM Dn-15 (R125)This category does not contain any products.
This category contains water, natural gas and electricity metering devices for apartments, private houses, shops, offices, industrial facilities, boiler houses and other sites. You can choose anything from a simple mechanical meter for internal monitoring to a modern electronic model with automatic reading transmission.
A correctly selected meter helps monitor actual resource consumption, detect excessive use in time and pay for water, gas or electricity according to measured readings. For official commercial metering, the device must meet the requirements of the servicing organisation and have the necessary documentation.
Water meters differ by connection diameter, water temperature, measurement principle, permitted flow rate and reading transmission method. Compact DN15 or DN20 models are commonly used in apartments, while private yards, businesses and main pipelines may require larger-diameter devices.
The catalogue includes:
Important: a cold-water meter should not automatically be considered suitable for hot water. Check the permitted operating temperature of the specific model before purchasing.
Gas meters are selected according to maximum flow, meter size, connection diameter, operating pressure, installation location and the number of connected gas appliances. An apartment with a single gas cooker normally requires a lower-capacity meter than a house with a cooker, boiler and water heater.
Depending on the model, a gas meter may include:
The G size indicates the flow capacity of a gas meter. For example, G2.5, G4, G6 and G10 are designed for different consumption ranges. A model must not be selected by pipe diameter alone: the total consumption of all connected gas appliances must be considered.
Electricity meters differ by the number of phases, rated voltage, maximum current, connection method, number of tariffs and remote data transmission capability.
PLC is a technology that transmits data through existing electrical wiring. It normally requires a compatible data concentrator and a configured metering system. The presence of a PLC module does not mean that the meter independently sends data through the mobile internet.
Different communication methods may be used depending on the model:
The modem and metering system must be compatible. The presence of a radio module, SIM card or communication interface does not automatically guarantee that readings will be transmitted to a particular servicing organisation.
Technical symbols are useful, but the more important question is: will the device suit the particular pipe, load and metering system? This is what should be checked before payment.
Proper installation may require fittings, connectors and shut-off valves, filters, check valves, gaskets, communication cables, current transformers, modems, protective enclosures and sealing components.
When required, you can order equipment installation and connection services. Installation cost depends on the meter type, pipe diameter and material, electrical circuit, installation location and amount of preparatory work.
Not every meter is suitable for official billing with a utility supplier. Requirements may vary depending on the type of site, region, servicing organisation and the automated metering system currently in use.
Before ordering, confirm the model, communication type, verification period and document package with the organisation that will accept the device for operation. A technical specification or project should preferably be prepared for an industrial facility.
Images on the website may be provided for reference. Markings, packaging, housing colour and individual package components may be changed by the manufacturer without altering the main specifications.
An order can be placed directly through the Schetchik.uz website. Various payment methods, instalment options for eligible products and delivery throughout Tashkent and the regions of Uzbekistan are available.
📞 For advice, call +998 71 200-18-00. Tell the specialist which resource must be measured, where the device will be installed and which connection parameters are known. This will help identify a suitable model more quickly.
📊 A good meter does more than display numbers. It turns resource consumption from a guess into a precise and understandable result.