Tashkent, Mukhtar Ashrafi str., 34. Landmark: Yashnabad power supply, Samarkand cafe.
Mo-Fr 9:00—18:00; Sa 9:00—16:00
Tashkent
✖
Is Columbus your city?
Yes
Choose another city
CATALOG
The cart is empty$00
The cart is empty
cart is empty
0CartEmpty$0
The cart is empty
cart is empty

Gas, Water and Electricity Meter Installation

GAS · WATER · ELECTRICITY

Need a meter installed?
Start with a specialist.

Send a photo of the installation site, your meter type and address. A Schetchik.uz operator will clarify the details and arrange a date with you. Installation is carried out by certified specialists.

Telegram: +998 90 957-51-21 · Phone: +998 71 200-18-00

1 business day

To review your request

1–3 days

For the technician’s visit after confirmation

30–90 minutes

For a standard meter installation

Timelines and prices for complex work are agreed individually. Your operator will confirm the visit date when arranging your request.

Three steps from request to installation

Have the details ready so your operator can better understand the work required.

STEP 01

Get in touch

Message us on Telegram or call. Tell us whether you need a gas, water or electricity meter installed.

STEP 02

Send the details

Provide the address, your preferred time and a photo of the installation site. Your operator will clarify the requirements and arrange a date.

STEP 03

Prepare the site

Provide access to the installation area and prepare the premises according to the agreed requirements.

What to include in your request

  • Meter type: gas, water or electricity.
  • Photo: the area where the meter will be installed.
  • Address: the location of the property.
  • Preferred time: when you can meet the specialist.

You can start with a simple message: “I need a meter installed. Here are the photo and address.”

Before the technician arrives

  • Installation must be carried out only by certified specialists.
  • Permission to replace the meter must be obtained before replacement.
  • Arrange in advance for the relevant supply — gas, water or electricity — to be temporarily shut off.
  • Provide access to the installation site and prepare the premises.

Before you book

How much does installation cost?

Ask your operator for the price for your property. Send the meter type and a photo of the installation site. Prices and timelines for complex work are agreed individually.

When can the technician visit?

Requests are reviewed within one business day. The technician’s visit takes place 1–3 days after confirmation. Your operator will agree the specific date with you.

How long does installation take?

A standard installation takes 30–90 minutes. The time needed for complex work is agreed individually.

Send a photo — let’s discuss your installation

Your meter type, a photo of the installation site, the address and your preferred time: that’s what we need to get started.

Message us on Telegram ↗

Prefer to call? +998 71 200-18-00

We use cookies to make the site better for you.