Tariffs: gas — 1100, water — 3808, mountains.water — 8928.67, electricity — 650, heating — 241.44, garbage — 8,400 soums. For more information (click on the bar)
Tashkent, Mukhtar Ashrafi str., 34. Landmark: Yashnabad power supply, Samarkand cafe.
Mo-Fr 9:00—18:00; Sa 9:00—16:00
Без названия
CATALOG
The cart is empty0 sum0
The cart is empty
cart is empty
0CartEmpty0 sum
The cart is empty
cart is empty
Tariffs: gas — 1100, water — 3808, mountains.water — 8928.67, electricity — 650, heating — 241.44, garbage — 8,400 soums. For more information (click on the bar)

3-phase electricity meter | TE73 SP-2-3 | 380V 100A | PLC modem

5.00
Share
3-phase electricity meter | TE73 SP-2-3 | 380V 100A | PLC modem

⚡ The TE73 SP-2-3, 230/400 V, 10(100) A three-phase electronic electricity meter is designed for multi-tariff measurement of active and reactive energy in private houses, industrial and commercial facilities. Its removable PLC module transmits readings over existing power wiring to a compatible concentrator, while RS-485 and the optical port support configuration and local data reading.

Additional services:
Characteristics
Brand:
Tashelectroapparat
Phase:
3-phase
Working voltage:
230 × 400
Supply:
Battery, 220V, 380V, 400V
Amperage:
100 A
Installation object:
Cottage, A private house, Production, The solar panel, Electric vehicle, Company
Connecting ASKUG:
Yes
See all
Total views of this page: 10918
SKU: 20009811
Склад-1 (Ашрафи-34): In stock - 16 pcs.
Склад-2: Sold out
106 060points
?
The number of bonuses that you will receive when purchasing this product
3,500,000 sum/pcs.
Amount:
pcs.
Total:
3,500,000 sum
Notify me of a price reduction
Notify me of a price reduction
Ваша просьба принята!

Вы получите уведомление при снижении стоимости товара на указанные Вами контакты
Your E-mail
Your telephone number
- Fields must be filled in
Checking...
This item sale 394 counts
Информация о доставке
Курьер
по Ташкенту
Рассчитываем стоимость доставки...
по Республике
Рассчитываем стоимость доставки...
Самовывоз
Самовывоз
Рассчитываем стоимость доставки...
Order by phone:+998 71 200-18-00

Related files

Description

⚡ The TE73 SP-2-3 is a multifunction electronic meter designed to measure active and reactive energy in a three-phase four-wire network.

It supports direct connection up to 100 A per phase and transmits data through existing power wiring using a removable PLC module.

🔤 Model designation

  • S — three-element four-wire version;
  • P — removable PLC communication module;
  • 2 — 10(100) A current rating;
  • 3 — 230/400 V voltage rating.

The letter P identifies a PLC module. It is not a GSM modem, and no SIM card is installed inside the meter.

🔌 Main electrical ratings

  • number of phases — three;
  • network — three-phase, four-wire;
  • rated voltage — 230/400 V;
  • current rating — 10(100) A;
  • maximum current — 100 A per phase;
  • frequency — 50 Hz;
  • connection — direct.

No external current transformers are required.

🎯 Accuracy

  • active energy — class 1.0;
  • reactive energy — class 1.0;
  • meter constant — 1000 imp/kWh;
  • starting current — approximately 0.04 A.

📡 PLC communication

PLC transmits meter readings through existing mains wiring to a compatible concentrator.

Remote internet-based reading requires a PLC concentrator, compatible protocol, server software and meter registration in the AMR system.

🔗 Communication interfaces

  • PLC over power wiring;
  • RS-485 wired digital interface;
  • optical port for local reading and configuration;
  • GSM/GPRS is not included in the SP modification.

🕒 Multi-tariff operation

The meter supports at least four tariffs and can separate consumption by time period and day type.

💾 Memory and event records

Tariff readings, load profiles, daily and monthly values and event records are retained in non-volatile memory.

🚨 Monitored events

  • meter or terminal-cover opening;
  • power failure;
  • reverse energy flow;
  • power-limit violation;
  • configuration changes;
  • communication errors;
  • low internal-battery condition.

🌡️ Operating conditions

  • normal operating temperature — −25 to +60 °C;
  • permitted limiting range — −45 to +70 °C;
  • ingress protection — IP54.

📦 Package contents

  • TE73 SP-2-3 electricity meter;
  • removable PLC module;
  • terminal cover;
  • product passport;
  • operating manual;
  • certificate;
  • factory packaging.

✅ Key advantages

  • three-phase 230/400 V measurement;
  • direct connection up to 100 A per phase;
  • PLC data transmission;
  • no SIM card required;
  • active and reactive energy measurement;
  • four tariffs;
  • RS-485 and optical port;
  • AMR-system integration;
  • IP54 protection;
  • manufactured in Uzbekistan.

⚠️ Important: the existing Schetchik.uz description contains specifications for another version: 57.7/100 V and 1(6) A. The correct TE73 SP-2-3 values are 230/400 V and 10(100) A.

Features
Brand
Tashelectroapparat
Phase
3-phase
Working voltage
230 × 400
Supply
Battery, 220V, 380V, 400V
Amperage
100 A
Installation object
Cottage, A private house, Production, The solar panel, Electric vehicle, Company
Connecting ASKUG
Yes
Connecting ASKUE
Certificate (years):
10 - individual, 10 - legal entity
Number of tariffs
4
Direction of accounting
Active, Reactive
Accurasy (active) %
1
Accurasy (reactive) %
1
Sensitivity threshold m3/h
0.04
Rated frequency
50 Hz
Equipment
Product, Box, Modem (built-in), Passport, Certificate
Quantity per box
4
Size (length-width-height)
290 × 175 × 90 mm
Package size (length-width-height)
310 × 190 × 100 mm
Weight (net)
2100 g
Weight (gross)
3000 g
Color
Silver
Guarantee
36 mo.
Archive storage period
10 years
Life time
30 years
Working temperature
-40 — 70 °C
Degree of protection (IP)
IP54 — dust-protected, protected against splashing water
Number of ports
8
Maximum cross-section of the connected wire (mm)
7
Country
Uzbekistan
Condition
New
Have bought
394
Reviews

Loading...
Customers who bought 3-phase electricity meter | TE73 SP-2-3 | 380V 100A | PLC modem also bought
See also
We use cookies to make the site better for you.